    Using a Training Manual for Guidance

    Control Narratives And Training Manuals: Documentation That Speeds Startup

    The Quiet Throughput Killer and the Fix You Control

    Every extra day a facility limps through startup costs real money; missed production, overtime, rentals, and reputational drag. The countermeasure isn’t exotic: strong documentation.

    Treat control narratives and training manuals as core deliverables. Plan, standardize, and tie to how the plant actually behaves. Startups run cleaner and commissioning teams spend less time firefighting and more time verifying.

    Across the process industries, guidance from the Construction Industry Institute (CII), ISA, and regulators consistently ties clearer procedures and commissioning discipline to better outcomes in startup and early operations. 

    CII’s commissioning/startup research highlights critical success factors that include robust documentation and defined procedures, not just “as-built” drawings.

    Why Documentation Accelerates Commissioning

    Documentation isn’t overhead. It’s the operating system for startup. With complete, searchable, and consistent narratives/manuals:

    • Field teams diagnose faster because the intended control behavior is explicit—not buried in tribal knowledge.
    • Work can run in parallel: operators train while construction wraps, maintenance stages spares against documented BOMs, and supervisors finalize procedures grounded in the same logic the control system uses.
    • Commissioning and alarm handling lean on recognized practices, reducing noise and chasing only “real” alarms; like ISA-18.2 alarm lifecycle.

    CII’s commissioning/startup body of work calls out procedure quality, turnover packages, and disciplined CSU planning as critical success factors. The things that statistically show up on projects that meet schedule and performance targets.

    Control Narratives: Make System Behavior Unambiguous

    A control narrative explains what the automation does, not just what a person should do.

    It translates P&IDs and control philosophies into plain-language sequences for normal, abnormal, and shutdown states. These include cause-and-effect logic, permissives, interlocks, timing, and alarms. That clarity is priceless during first-fire and upset testing.

    Anchor your format to standards so every system reads the same way:

    • Alarm behavior and responses consistent with ISA-18.2 (alarm philosophy, rationalization, KPIs).
    • Procedural automation patterns per ISA-106 (models, styles, lifecycle for automating procedures in continuous processes).
    • Safety functions linked to the IEC 61511 lifecycle (SIS/SIL targets captured in Safety Requirements Specifications, then reflected in the narrative and logic).

    What Good Looks Like: Fast on the Eyes, Useful in the Field

    • Structure: Overview → modes/states → sequences (start/normal/stop/upset) → interlocks & permissives → alarms & operator actions → fail-safe behavior.
    • Language: Concrete, stepwise conditions (“If suction pressure < X for ≥ Y s, then close Z; if not cleared in ≤ T s, raise Alarm A with priority B”). Avoid vague qualifiers.
    • Cross-links: P&IDs, loop sheets, cause-and-effects, alarm philosophy, and HMI screenshots are interlinked so techs pivot in one click.
    • Version control: Revisions tied to MOC; field redlines reconcile into the master narrative before turnover.

    Looking for an EPC Company that does it all from start to finish, with in house experts?

    Training Manuals: Turning Book Learning Into Safe, Fast Competence

    Great manuals shorten time-to-competency by pairing tasks with the why behind them. Especially where safety and reliability depend on correct first actions.

    Build on sector references and regulatory frameworks:

    • For pipeline and midstream operations, API RP 1161 lays out Operator Qualification (OQ) program guidance; PHMSA provides OQ FAQs that clarify expectations. Use these to shape job task analyses, qualification methods, and refresher cycles.
    • Align alarm/abnormal response training with your ISA-18.2 alarm philosophy so operators learn the system they’ll actually see.

    Manual Design That Sticks Under Pressure

    • Organized by job role and scenario, not department. Operators get state-based playbooks; maintenance gets condition-based checks; supervisors get shift-change and escalation flows.
    • Multiple modalities: diagrams and flows for visual learners; narrations or brief videos for auditory learners; walkthrough/simulation drills for kinesthetic learners.
    • Decision aids: concise fault trees and “first five minutes” cards for high-stress events.
    • Competency gates: short checks at the end of each module tied to OQ or site standards, with remedial loops if a trainee struggles on a step that’s safety-critical.

    How Documentation Speeds Startup

    1. Faster diagnosis. When commissioning trips a shutdown, the narrative points straight to the interlock logic and intended operator response; teams fix causes, not symptoms.
    2. Parallelism. While I&E closes punch items, ops can train against the same logic the PLC will run; maintenance can pre-position spares from approved data sheets.
    3. Cleaner alarms. Documented alarm philosophy (ISA-18.2) trims nuisance alarms, focuses attention, and reduces alarm floods during startup transients.
    4. Safer handovers. Narratives and manuals become the backbone of CSU turnover packages highlighted in CII commissioning/startup guidance.

    Control Narrative Best Practices

    1) Standardize the skeleton. Use one template across units: states, transitions, timing, permissives, interlocks, alarms, failsafes, and manual interventions.

    2) Write for the reader. Keep syntax consistent and testable. Every condition is measurable; every response has a time base and priority.

    3) Tie to safety from day one. When a HAZOP or LOPA assigns a SIF and SIL, update the narrative and tag references so the SIS logic and BPCS are coherent.

    4) Make it navigable. Hyperlink P&IDs, loop sheets, alarm rationalization tables, and HMI mockups; build the same links into your CMMS and historian so techs can jump from an alarm to the narrative and then to the work order.

    5) Control the versions. No “mystery PDFs.” Check in/out through your document control; link MOC numbers to each revision.

    Training Manual Excellence Built for Real Plants

    1) Start from tasks. Derive modules from a role’s critical tasks (as OQ/PHMSA frameworks expect), then teach why the task and the system behavior matter.

    2) Simulate realities. Drills on start/stop, loss of utility, upset recovery, and alarm floods build true confidence.

    3) Keep it plain. Define site-specific terms. Side-bars for “common pitfalls” and “don’t do this” moments.

    4) Measure and adapt. Put quick checks at the end of every module and trend time-to-competency; close gaps with micro-lessons, not just longer manuals.

    Implementation Playbook

    Phase 1: Foundation

    • Draft your alarm philosophy (ISA-18.2) and narrative template (with ISA-106/IEC-61511 hooks).
    • Inventory systems needing narratives; prioritize safety-critical and high-complexity units first.

    Phase 2: Write and Wire

    • Write narratives alongside control logic development; cross-link tags and sequences.
    • Build training modules from those same narratives and your OQ task list (API RP 1161).

    Phase 3: Prove It Before Startup

    • Dry-run procedures in a FAT/SAT context; test alarm rates against philosophy targets; fix gaps in docs and HMI language. This aligns with CII’s CSU best-practice emphasis on readiness and defined turnover.

    Phase 4: Turnover & Sustain

    • Deliver a navigable package: narratives, alarm philosophy, HMI guide, data sheets, P&IDs, and training modules—version-controlled and searchable.
    • Put reviews on the calendar: post-startup 30/60/90-day edits, then quarterly light updates and annual full sweeps.

    KPIs That Show the Payoff

    • Commissioning first-pass yield (tests accepted on first try).
    • Alarm health (ISA-18.2 KPIs: standing alarms, alarms/hour/operator at steady state, top offenders).
    • Time-to-competency for new roles (aligned with OQ expectations).
    • Post-startup change rate (number of logic/document changes in first 90 days).
    • Mean time to diagnose top 10 faults (trend down as narratives improve).

    Common Pitfalls and Quick Fixes

    • Vague logic. Replace “when pressure is high” with thresholds, deadbands, and timers.
    • Document drift. Tie every code change to a document update via MOC.
    • Alarm floods. Rationalize against ISA-18.2; demote, suppress (safely), or eliminate chaff.
    • Training that’s “read-only.” Add scenario drills and short, role-based refreshers keyed to recent incidents and bad-actor alarms.

    Your First Three Moves

    1. Adopt a narrative template mapped to ISA-106 states plus ISA-18.2 alarm hooks; pilot it on one complex unit.
    2. Publish an alarm philosophy one-pager (priorities, KPIs, standing-alarm rules) and socialize it at the console.
    3. Stand up a role-based training index tied to your OQ program (API RP 1161/PHMSA FAQs) so every trainee knows the modules to complete before CSU.
    Dan Eaves

    Dan Eaves, PE, CSE

    Dan has been a registered Professional Engineer (PE) since 2016 and holds a Certified SCADA Engineer (CSE) credential. He joined PLC Construction & Engineering (PLC) in 2015 and has led the development and management of PLC’s Engineering Services Division. With over 15 years of hands-on experience in automation and control systems — including a decade focused on upstream and mid-stream oil & gas operations — Dan brings deep technical expertise and a results-driven mindset to every project.

    PLC Construction & Engineering (PLC) is a nationally recognized EPC company and contractor providing comprehensive, end-to-end project solutions. The company’s core services include Project Engineering & Design, SCADA, Automation & Control, Commissioning, Relief Systems and Flare Studies, Field Services, Construction, and Fabrication. PLC’s integrated approach allows clients to move seamlessly from concept to completion with in-house experts managing every phase of the process. By combining engineering precision, field expertise, and construction excellence, PLC delivers efficient, high-quality results that meet the complex demands of modern industrial and energy projects.

    Read more
    Industrial Compressor Station

    Compressor Station Optimization: Advanced Control Strategies That Cut Downtime

    Why Compressor Failures Hurt So Much

    When a station trips, the losses stack fast. Lost throughput, missed nominations, penalty risk, and crews scrambling. Across heavy industry, recent surveys peg the typical cost of unplanned downtime in the six figures per hour (and higher for some operations).

    This is why “run-to-fail” is no longer a plan; if it ever was.

    Modern control rooms don’t live on clipboards. They run real-time analytics, predictive models, and alarm logic tuned to catch weak signals early. 

    Done well, predictive maintenance programs have been shown to cut downtime by up to ~50% and reduce maintenance costs by roughly 10–40%, depending on asset class and maturity.

    Optimization isn’t a slogan; it’s an operating posture.

    • Regulators push for cleaner, safer operations.
    • Customers want reliability.
    • Investors watch margins.

    The only way to satisfy all three is to squeeze more availability and efficiency from every compressor you own; without gambling on reliability.

    What “Optimization” Really Means

    Strip the jargon and you’re left with three outcomes: higher availability, lower energy per unit moved, and fewer surprises. World-class operations measure it. 

    As a rough compass, OEE benchmarks often cite 85% as “world-class” while many plants live closer to 60–70%, leaving obvious headroom. Your mix will vary, but the message is the same: there’s room to improve.

    Yesterday’s “optimize” meant looking at last month’s report and scheduling PM on a calendar. Today it means sensor networks, models that learn normal behavior, and controls that adjust in real time. It’s the difference between driving by the rear-view mirror and using live GPS.

    Expectations You Can Defend

    • Energy: Real-time optimization and set-point management in gas networks have delivered single- to double-digit reductions in compression energy in studies of dynamic operation (examples report ~5–8% savings in specific networks, with larger gains in some cases).
    • Maintenance: Data-driven programs consistently show double-digit cost reductions and large cuts in unplanned downtime when compared with purely time-based maintenance.
    • Reliability: Standard OT security and architecture (segmentation, least-privilege remote access) materially lowers the chance that cyber issues trigger operational incidents.

    Control Strategies That Actually Move the Needle

    1) See Problems Before They’re Problems

    Blanket monitoring isn’t the goal; discriminating monitoring is. 

    Vibration spectra, thermography, lube oil analysis, and process signals together spot the weak signals of bearing wear, misalignment, cooling issues, and electrical faults; months before a failure

    Machine-learning models then learn each machine’s “normal” and flag drift, so your team schedules work on your terms, not the asset’s. Studies across industries tie PdM to up to ~50% downtime reduction and 10–40% maintenance-cost cuts when it’s implemented well.

    Integrate this with your CMMS so work is triggered by condition: don’t change oil at 2,000 hours if analysis says it’s healthy; don’t wait if contamination spikes at 1,500. 

    Over time, your historian reveals true useful life:

    • “that bearing averages 18 months”
    • “those seals last ~5,000 cycles”

    So spares and windows are planned, not panicked.

    2) Load and Pressure Strategy, Not Guesswork

    Why run five machines at 70% when three at their sweet spot will do? Use smart load sharing to keep units near their best efficiency islands, and rotate runners to spread wear.

    Move from fixed discharge setpoints to dynamic pressure control that considers downstream demand, compressor maps, and fuel or power price. Delivering the same throughput with less energy and less equipment stress. 

    Pipeline studies and operations research continue to show energy savings by optimizing compression under transient conditions.

    Forecasts matter here. Blend weather, supply nominations, and historical profiles so the station ramps before the morning surge, not during it, shaving peak-period energy without risking service.

    3) Dashboards That Help Humans

    Operators don’t need ten screens of tiny numbers. They need compression efficiency, energy per MSCF, equipment health, and throughput; with drill-downs one click away.

    Alerts should be context-aware to kill alarm fatigue: group symptoms, route by severity, and escalate with evidence.

    4) Design for Fast Recovery

    Failures still happen. The difference between a stumble and a crisis is hot-standby designs, documented recovery (with tooling staged), and people who’ve rehearsed it.

    If your cost of downtime is measured in six figures per hour, it doesn’t take many averted hours to justify selective redundancy. 

    Industry surveys routinely show high downtime cost ranges, which is why resilience pays for itself.

    Looking for an EPC Company that does it all from start to finish, with in house experts?

    A Playbook To Making It Real

    Phase 1: Instrument and Baseline

    Start with health and energy instrumentation that feeds a historian. Establish KPIs: availability, trips per 1,000 hours, energy per throughput, mean time between failures.

    Phase 2: Predict and Prioritize

    Add analytics that spot early-warning patterns. Tie actions to the CMMS. Use the first quarter to validate “find-fix” loops and tune alarm logic.

    Phase 3: Automate Controls

    Introduce load-sharing and dynamic pressure control with clear guardrails. Pilot on one station, then templatize.

    Phase 4: Standardize and Scale

    Lock down naming, templates, spares, and playbooks so operators can cover multiple stations without relearning the HMI every time.

    Security and Compliance

    Industrial cybersecurity isn’t optional. 

    • Use zones and conduits to segment networks
    • Add a DMZ for business data
    • Enforce least-privilege, MFA-protected remote access
    • Instrument for detection.

    The current NIST SP 800-82 Rev. 3 and the ISA/IEC 62443 series are the go-to playbooks for ICS/OT architecture and controls. Build them and you’ll satisfy both risk and audit.

    What to Measure And Prove

    • Availability (target ≥95% for critical lines) and MTBF by unit.
    • Energy per unit throughput and compressor efficiency trends; verify savings against weather and demand to avoid “phantom” gains. Academic and OR literature on gas networks documents measurable energy cuts from dynamic compressor optimization.
    • Maintenance mix: % reactive vs. planned vs. condition-based; trend toward more CBM.
    • Alarm quality: rate, deduplication, time-to-ack; aim for fewer, better alerts.

    Budget, Timing, and ROI

    You don’t have to big-bang this. Many teams see early wins inside a quarter once monitoring is live and work orders are tied to conditions.

    Industry reports and surveys consistently show double-digit O&M savings and meaningful downtime reductions from predictive programs. Some organizations report paybacks inside 6–18 months; asset class and starting point drive the spread.

    On the capital side, avoid gold-plating redundancy. Protect the true bottlenecks first: drivers, key auxiliaries, controls infrastructure. If your outage cost sits in six figures per hour, even a modest reduction in event frequency or duration closes the loop quickly.

    Putting the Pieces Together

    • Health Monitoring: vibration, temperature, lube, and process KPIs wired to a historian; anomaly detection tuned per unit.
    • Load/Pressure Control: automate load sharing; replace fixed setpoints with demand-aware pressure targets. Validate energy savings against baseline.
    • Human-Centered HMI: KPI-first displays; alarm suppression and routing that cut noise.
    • Playbooks & Spares: standard recovery steps; staged tools; minimum spares for known failure modes.
    • Security: segmented networks, MFA remote access, logging/monitoring that operations can actually use.

    Bottom Line

    Advanced control isn’t a luxury, it’s how competitive stations run. Predictive maintenance, intelligent load management, better HMIs, and solid security raise availability, cut energy, and reduce surprises.

    Start with an honest baseline, pilot where the payoff is obvious, and scale what works.

    If you want help prioritizing the first pilot, begin with the station showing the worst energy per MSCF and highest alarm rate. That combination usually hides the fastest wins.

    Dan Eaves

    Dan Eaves, PE, CSE

    Dan has been a registered Professional Engineer (PE) since 2016 and holds a Certified SCADA Engineer (CSE) credential. He joined PLC Construction & Engineering (PLC) in 2015 and has led the development and management of PLC’s Engineering Services Division. With over 15 years of hands-on experience in automation and control systems — including a decade focused on upstream and mid-stream oil & gas operations — Dan brings deep technical expertise and a results-driven mindset to every project.

    PLC Construction & Engineering (PLC) is a nationally recognized EPC company and contractor providing comprehensive, end-to-end project solutions. The company’s core services include Project Engineering & Design, SCADA, Automation & Control, Commissioning, Relief Systems and Flare Studies, Field Services, Construction, and Fabrication. PLC’s integrated approach allows clients to move seamlessly from concept to completion with in-house experts managing every phase of the process. By combining engineering precision, field expertise, and construction excellence, PLC delivers efficient, high-quality results that meet the complex demands of modern industrial and energy projects.

    Read more
    • 1
    • 2