Eagle Ford Shale Gas

Eagle Ford Shale Gas

PLC Construction, Inc. was a contractor for I&E construction, programming, and commissioning services for a 200MMSCFD Cryogenic gas plant in South Texas. PLC’s original scope was the control system hardware specification, PLC programming, HMI development and commissioning. The plant used a redundant Allen Bradley CLX (PCS) and an Allen Bradley GuardLogix (SIS) with a Wonderware HMI. In addition, a smart MCC and switchgear monitoring was integrated into the control system. 

Late in the construction phase, PLC was asked to perform ISA 84 Segregation on the control system. PLC mobilized a crew of engineers, programmers, instrument technicians and electricians 6 weeks early to ensure the segregation was properly implemented and there was no delay in schedule. 

To achieve this goal, all wiring drawings were updated, our electrical construction crew performed the new I/O terminations and simultaneously our programmers were performing loop checks on the completed panels. The operations staff was embedded in the loop check process from the control room to the field to guarantee thorough training.

Project Data

Client:

Anadarko Petroleum Company

Location:

South Texas

Industry:

Oil & Gas Industry

Service:

Project Data

Project Value:

4000000

Project Hours:

42103

Project Location:

South Texas

Project Type:

Oil & Gas Industry

Project Owner:

Anadarko Petroleum Company

Project Duration:

Jan 2012 – Sep 2013