Facility Nameplate Study

Facility Nameplate Study

Deliverables Designed for Safety, Compliance, and Cost Efficiency.

Pressure-Relief Device Reevaluation

  • Full review of impacted pressure-relief devices to accommodate increased unit throughput or duties.
  • Updated deliverables ensure optimized performance and compliance with current standards.

Overpressure Protection Evaluation

  • Proprietary calculation workbooks with PDF deliverables.
  • Compliance with latest codes and industry standards.
  • Evaluation of all credible overpressure scenarios, including:
    • Blocked flow, loss of cooling, thermal expansion,external fire exposure, and more.
  • Each report includes:
    • Scenario credibility and controlling basis
    • Protected system MAWP and capacity analysis
    • Device specification sheets and system drawings
    • Detailed calculations for relief rates, areas, and discharge conditions

Pipe Stress Analysis

  • Caesar-based analysis for PRVs >2" or low-temperature discharge scenarios.
  • Identification and resolution of overstressed conditions for safe operation.

Vent Header & Disposal System Modeling

  • Hydraulic modeling of disposal systems.
  • KO vessel sizing, flare tip documentation, and master relief device tracking list.
  • Recommendations for dispersion modeling when API 521 criteria are not met.

Key Benefits:

  • Comprehensive compliance with API 521 and industry standards
  • Cost savings through optimized revision strategy
  • Enhanced safety via detailed scenario analysis and stress evaluations
Facility Nameplate Study

Project Data

Client:

Midstream Energy Company

Location:

Washington, PA

Industry:

Oil & Gas Industry

Service:

Facility Nameplate Study

Facility Nameplate Study

Project Data

Project Value:

180000

Project Hours:

Project Location:

Washington, PA

Project Type:

Oil & Gas Industry

Project Owner:

Midstream Energy Company

Project Duration:

Oct 2024 – Oct 2025

Secret Link