Water Treatment

Water Treatment plant Construction

Integrated Water Solutions, Engineered for Every Industry. From design to installation — complete treatment systems tailored to your facility.

water treatment plant construction

PLC Construction‘s in-house capabilities include engineering and design support for the full integration of third-party technology and equipment for the water industry including the building of skids, fabrication of steel and pipe, as well as full installation efforts.

We work in every industry sector to provide turnkey water solutions in every U.S. industrial and renewable market for the pre-treatment and post-treatment of water for every unique facility processing requirement. We are capable of taking project specifications and performance requirements to tailor the most suitable water processing application and specialty company to ultimately design and build a full solution to your water treatment and processing needs.

Our core services

Success every step of the way

Project Services

Engineering Services

Design Services

SCADA Services

Automation & Control Systems Services

Commissioning Services

Relief Systems/Flare Studies

Construction Services

See where we have put our principals in action.

Our recent Projects

Services

  • All
  • Construction
  • Fabrication Shop
  • Panel Fabrication
  • Project Services
  • Engineering Services
  • Design Services
  • Automation/Control Systems
  • SCADA
  • Commissioning
  • Relief Systems/Flare Studies
  • Field Services

Location

  • All
  • South Texas
  • West Texas
  • Ft. Wayne, Indiana
  • Liberty, Texas
  • Culberson County, Texas
  • Carlsbad, New Mexico
  • Vernal, Utah
  • Washington, PA
  • Permian Basin, Texas
  • Dunmore, Pennsylvania
  • Greater Houston, Texas
  • Permian Basin, New Mexico
  • Mentone, Texas
  • Platteville, Colorado
  • Loving County, Texas

Industries

  • All
  • Renewables/Municipal Industry
  • Oil & Gas Industry
  • Water Treatment Industry

Featured Case Study

Ft. Wayne RNG Facility

RAMSEY3

Ft. Wayne RNG Facility

PLC proudly delivered a full EPC (Engineering, Procurement & Construction) solution for a cutting-edge Renewable Natural Gas (RNG) facility in Fort Wayne, Indiana. Built adjacent to an active landfill, this plant transforms waste into clean energy — a bold leap toward sustainability and innovation.

 

Facility Highlights 

The Ft. Wayne Plant can process up to 6,400 standard cubic feet per minute (scfm) of landfill gas.

  • Designed and constructed to meet safety and performance standards. 
  •  
  • Fully integrated systems for gas processing, piping,electrical, and instrumentation.
  • Comprehensive project scope, including: Engineering and Design
    • Engineering and Design 
    • Equipment installation and material Procurement
    • Piping and rack fabrication/installation
    • Full instrumentation and electrical implementation 
    • Commissioning and Start-Up

 

Project Excellence

PLC’s execution of the Fort Wayne RNG Facility exemplifies our commitment to engineering excellence, operational precision, and environmental responsibility. From initial concept through final commissioning, every phase of the project was delivered with:

  • Uncompromising Safety Standards
  • Quality Without Compromise
  • Efficiency in Action
  • Sustainability at the Core

 

This facility isn’t just a construction achievement — it’s a symbol of progress. By converting landfill gas into renewable energy, PLC helped our client take a bold step toward a cleaner, greener future.

Project Value:

$1,084,000

Owner:

Energy Company

Project Duration:

June 2023 – August 2024

Statistics:

HOURS 19,520

Featured Case Study

Station Control Panels for SWD Facility

Your Project. Our Expertise.

We provide complete solutions for the assembly and installation of SCP-101 and NJB-101 panels. Our scope includes purchasing procuring, assembling, and installing all required materials according to the provided layout and bill of materials, as well as the redlined panel drawings. Every detail is overseen by our experienced team to ensure compliance with specifications and seamless execution.

In addition to fabrication and installation, we prepare and pack the panels for secure shipping, ensuring they arrive ready for integration into your operations. Our commitment to quality and efficiency means your project stays on schedule and within budget.

SWDs

Project Value:

$1,084,000

Owner:

Energy Company

Project Duration:

June 2023 – August 2024

Statistics:

HOURS 19,520