CTB & Well Pad Tie-Ins

Screenshot 2026 03 07 at 1.22.53 AM

Integrated EPC Delivery for Scalable Production Project Overview PLC Construction was proud to partner with our client to deliver full Engineering, Procurement, and Construction (EPC) services for the development of a centralized tank battery (CTB) with (2) two remote well pad tie-ins, designed to streamline field operations, improve production efficiency, and drive long-term growth. EPC […]

Mechanical & I&E Construction of Central Tank Battery

image004 1

PLC Construction was awarded the mechanical and instrumentation/electrical (I/E) construction of a centralized tank battery in the Permian Basin. Our scope included setting critical equipment, fabricating and installing pipe spools, hydrotesting all required piping, and performing complete installation and commissioning of electrical and safety systems.  Mechanical construction deliverables were completed in alignment with engineering specifications, […]

Eagle Ford Shale Gas

DJI 0015 e1502978649778

PLC Construction, Inc. was a contractor for I&E construction, programming, and commissioning services for a 200MMSCFD Cryogenic gas plant in South Texas. PLC’s original scope was the control system hardware specification, PLC programming, HMI development and commissioning. The plant used a redundant Allen Bradley CLX (PCS) and an Allen Bradley GuardLogix (SIS) with a Wonderware […]

6,400-SCFM RNG Facility

Screenshot 2025 11 24 at 7.21.33 PM

PLC proudly delivered a full EPC (Engineering, Procurement & Construction) solution for a cutting-edge Renewable Natural Gas (RNG) facility in Fort Wayne, Indiana. Built adjacent to an active landfill, this plant transforms waste into clean energy — a bold leap toward sustainability and innovation. Facility Highlights  The 6,4000-SCFM RNG Facility can process up to 6,400 […]

Compressor Station

Compressor Station

PLC Construction was selected by our client to execute the Instrumentation & Electrical scope for a new Compressor Station in New Mexico. Designed to handle 25 MMcf/d of sour gas, this facility required expert system integration, precision installation, and a disciplined approach to safety. Scope of Work Safety & QualityPLC completed this project — along […]